A public-interest initiative for well accountability and remediation Explore the well atlas
IDENTIFY. INVESTIGATE. REMEDIATE.

Abandoned wells
shouldn't stay invisible.

We’re building a public resource to document unplugged wells, trace their histories, understand environmental risks, and help move responsible remediation forward.

◎ Evidence-led information. Transparent methods. Accountable action.
ONE WELL
AT A TIME
PUBLIC DATA · PUBLIC PURPOSE
⌖Public data firstSources and dates shown
⌁Evidence-led recordsFacts separated from estimates
↗Remediation focusedFrom identification to closure
WHY OPEN WELLS EXISTS

Find the wells.
Follow the facts.
Help seal them.

Across the United States, historic oil and gas development has left a complex legacy of unplugged and orphaned wells. Some may emit methane or pose other environmental risks. Many have incomplete records, unclear ownership histories, or no readily identifiable party responsible for plugging.

Open Wells Initiative aims to connect public records, engineering knowledge, community reporting, and remediation resources in one transparent platform.

How the initiative works →
THE NATIONAL WELL ATLAS

Explore the well
record.

Search the real record: 117,672 documented unplugged orphaned wells across 27 states, compiled by the U.S. Geological Survey from state oil & gas agency records. Every point on the atlas is a real well at its documented location.

117,672

documented unplugged orphaned oil & gas wells in 27 states — USGS Documented Orphaned Well Database, built from state agency records (CC0). Ownership history is being layered in from state regulator records, starting with the nine states that publish operator-transfer data.

Open the national atlas →
Live data: USGS documented orphaned wells (CC0), compiled from state agency records.Data sources & methodology →
ACCOUNTABILITY THROUGH DOCUMENTATION

Every well has
a history.

We aim to connect the records that tell a well’s story—from original development and operating transfers to present-day status and verified remediation.

01
⌖
IdentifyWell IDs, permits, location and construction records
→
02
⇄
TraceOperators, transfers, corporate changes and ownership links
→
03
▤
VerifySource documents, dates, field evidence and legal status
→
04
✓
RemediateEngineering review, funding, plugging and closure records
i

Evidence before attribution. A historical operator, landowner, mineral owner, seller, or corporate successor is not automatically legally liable. The platform will distinguish documented relationships from legal responsibility determined by the appropriate authority.

MEASURE WHAT MATTERS

Transparency is
the first step
to progress.

We’ll report what is known, what remains uncertain, and what has actually changed. No inflated impact claims. No confusing estimates with measurements.

—Wells reviewed by OWIPublished after verification begins
—Verified methane measurementsMeasurement method and date required
—Wells sealed through supported projectsClosure documentation required
—Emissions reductions verifiedBaseline and post-plugging evidence required
ENGINEERING & EDUCATION

Show the work.
Explain the method.

Make well plugging and methane measurement understandable through open technical references, transparent assumptions, and educational calculation tools.

⌁
EMISSIONS

Methane impact estimator

Convert a measured methane flow rate into an annual emissions estimate and CO₂-equivalent using an explicitly selected GWP.

Open calculator →
▥
WELL PLUGGING

Cement volume estimator

Explore simplified bore-volume calculations, excess allowances, and the assumptions that a real plugging design must address.

Open calculator →
⌖
FIELD ASSESSMENT

Inspection methodology

Learn how records, site observations, pressure data, casing condition, and emissions measurements inform an assessment.

View methodology →
EDUCATIONAL TOOL

Estimate annual methane impact

Enter a measured methane emission rate. The result is an estimate—not a substitute for field measurement or regulatory reporting.

Use consistent units. This example uses a 100-year methane GWP of 27.2, an illustrative value for fossil methane based on IPCC AR6. Select the applicable value for formal work.
kg / hour
Estimated annual CO₂-equivalent238.3metric tonnes CO₂e / year

Assumes a constant emission rate for 8,760 hours. Actual emissions vary and should be measured using an appropriate method.

EDUCATIONAL TOOL

Estimate cement volume for a plug

A simplified bore-volume estimate for one cement plug filling an open borehole interval: V = π × d² ÷ 4 × L. Enter the borehole diameter and the plug interval length, then add an excess allowance for washouts and irregular hole.

Educational only. A real plugging design accounts for casing strings and their internal diameters, caliper logs, multiple plugs and spacers, cement class and additives, and the plugging rules of the state where the well sits.
inches
feet
%
ft³ / sack
Estimated cement required41.7sacks (incl. excess)

Bore volume 39.4 ft³ · with excess 49.3 ft³ · ≈ 8.8 barrels of slurry.

FROM INFORMATION TO ACTION

Help move a well
toward closure.

Better records can support better decisions. There are several ways to contribute as the initiative develops.

COMMUNITY WELL REPORTING

Help us find
what’s missing.

Share information about a potentially abandoned or leaking well. Please do not trespass or approach a suspected leak. In an emergency, contact the appropriate local or state authorities.

Submissions are private until reviewed. Your report goes into the initiative's review queue — nothing is published automatically.
DATA SOURCES & METHODOLOGY

Trust starts
with sources.

OWI’s public records should be traceable to their original source. The atlas is connected to the live record set: 117,672 documented orphaned wells from the U.S. Geological Survey database, with state regulator records being integrated for ownership history.

Inspection methodology

How a documented well is assessed before anything is concluded about it:

  1. Records review — drilling permits, completion and plugging reports, and operator history establish what the well is supposed to be.
  2. Site observation — wellhead and casing condition, signage, stressed vegetation, soil staining, and standing fluids are documented without disturbing the site.
  3. Pressure and integrity checks — shut-in and annular pressures show whether the well is holding or communicating with the surface.
  4. Casing condition — logs and mechanical-integrity evidence indicate corrosion, parted casing, or failed cement behind pipe.
  5. Emissions measurement — screening (for example an optical gas imaging camera) followed by quantification where a leak is found; screening alone never produces a published rate.
  6. Classification and reporting — findings are recorded with their source, date, method, and uncertainty, and the well's documented status is updated only from that evidence.
Data integrity commitment

Each published record should identify its source, retrieval date, verification status, and known limitations. Estimated emissions must never be displayed as measured emissions. A well’s status in one agency’s dataset must not be treated as a legal determination in another jurisdiction.

A PUBLIC RESOURCE. A PRACTICAL MISSION.

Make the invisible
impossible to ignore.

Build a clearer record. Support responsible remediation. Help prevent tomorrow’s abandoned wells.

Explore the initiative →